• <big id="otzxk"><samp id="otzxk"></samp></big>
    <em id="otzxk"></em>
    <table id="otzxk"><strong id="otzxk"></strong></table>
    <tt id="otzxk"></tt>
    <del id="otzxk"></del>
    亚洲av成人无码天堂,久久精品国产99久久丝袜,在线中文字幕国产一区,四虎成人在线观看免费,无码天堂亚洲国产AV,欧美黑人性暴力猛交在线视频 ,欧美粗大,国产免费午夜福利蜜芽无码
    Your current location:Home -News -Industry news
    Industry news

    How to operate and maintain the hot runner system?

    Date:2023-03-24View:10225

    Production, operation and maintenance of hot runner system:


    (1) Preparation

    The mould worker connects the cooling water channels of the moving mould, the fixed mould and the hot half mould. If the temperature requirements on both sides of the dynamic mold and the fixed mold are different, a separate water path must be connected for rotation. If the product appearance quality requirements are high, it is recommended to separate the mold temperature on both sides of the moving and fixed mold: if the heat generated by the heating of the hot runner on the side of the hot half mold is more, the cooling water can be separately connected; if the heat generated by the heating of the hot runner on the side of the hot half mold is absorbed or lost by the template, the model can be connected with the warm water at the appropriate temperature to compensate for the heat loss.


    The heating cable between the hot runner and the thermostat shall be connected correctly according to the mark of the plug, and the plug QQ shall be locked to prevent loosening. If the heating output cable is connected reversely with the heating cable, all thermocouples will be burnt. After the mold is packed, the screw temperature of the first injection molding machine reaches the required set temperature. At the same time, turn on the mold temperature machine for heating, so that the mold temperature reaches the set temperature required for production. Then change the working temperature of the heated hot runner system to plastic.


    It should be noted that after the hot runner of the new mold rises to the set temperature, it will take about 5 to 10 minutes (to ensure uniform heating). If the raw material contains fiberglass, it will take longer (about 10 to 15 minutes) because the heat transfer performance of the tungsten steel tip is poor.


    (2) Power on

    First of all, find out the raw materials used in the last mold test, adjust the temperature of the screw and nozzle of the injection molding machine to the temperature of the raw materials in the melting state, and select the appropriate plastic materials to clean the screw


    If the plastic produced contains LCP + 30% glass fiber, clean the hot runner with pure LCP material (without glass fiber). After opening, it should be noted that the rubber outlet is very smooth; when it is found that one or several hot nozzles do not produce materials, there are two situations as follows:


    There is cold material in the gate, which can be baked and melted by hot air gun, and then the safety door is closed to spray glue again;

    If there is still hot nozzle without material, find out the number of nozzle according to the location map of hot nozzle. The temperature of the nozzle is increased by 10 ~ 20 ℃ on the original basis, and then it is ignited immediately (no more than 3 times). After tapping the glue, cool it to production temperature. At this time, if the gate is still blocked, the production shall be stopped immediately, and the hot nozzle of the blocked rubber shall be removed from the lower mold or the supplier shall be informed to handle it.


    3) Stop waiting

    Immediately clean the rubber in the hot runner with pure LCP material to keep the residual material in the hot runner and the head of the hot nozzle inside. It is a LCP material with good fluidity in the whole process, and ensure the next test or production to be carried out smoothly. For more than 5 minutes due to machine failure or other reasons, it is necessary to put the hot runner in the insulation state of 250 ℃; if more than 10 minutes, it is set to 120 ℃.


    (4) Change the color of raw materials

    Clean the barrel and screw with raw materials until the old color is completely clear. Check the machine's nozzles and hot runner gates for old colors. Open the mold core and remove the plastic in front of the nozzle.


    (5) Stop machine repair mold

    Before separating the hot runner from the core, make sure that the hot runner heating output is closed and the nozzle temperature is cooled to room temperature (< 60 ℃). If the raw material contains glass fiber, use the raw material without glass fiber to remove the raw glass fiber material, otherwise the glass fiber material may be carbonized in the next heating.

    主站蜘蛛池模板: 亚洲最大有声小说AV网| 日韩无码一区二| 国产一区二区三区在线电影| 亚洲精品一区二区区别| 无套内谢少妇高清毛片| 与子敌伦刺激对白播放的优点| 国产午夜精品理论大片| 又色又爽又高潮高清免费国产| 秋霞在线观看秋| 在线观看中文字幕国产码| 国产成人无码AA精品一| 无码人妻品一区二区三区精99| 中文字幕日本| 国产成人免费高清在线观看| 国产熟妇久久777777| 国产一区一一区高清不卡| 久久精品国产亚洲av麻豆软件| 伊人久久大香线蕉AV网| 日韩av免费在线天堂| 妺妺窝人体色www看美女| 日韩精品自拍偷拍一区二区 | 亚洲精品456在在线播放| 亚洲欧美人成人综合在线播放| 精品人妻伦九区久久aaa片| 天堂在线精品亚洲综合网| 欧美精品福利| 制服先锋资源AV| 区美一区二不视频| 97视频| 在线 欧美 中文 亚洲 精品| 亚洲欧美人成电影在线观看| 日韩av熟女人妻一区二| 国产精品一亚洲AV日韩AV欧| 久久久久青草线蕉亚洲| 色噜噜精品一区二区三| 色婷婷亚洲婷婷7月| 中文字幕人妻系列| 日本东京热一区二区三区| 精品免费看国产一区二区| 日韩?欧美?亚洲?人妻?专区| 亚洲3p无码一区二区三区|